Preparing the Site

An exciting, albeit somewhat violent, phase of construction when machinery takes over to turn a pristine piece of property into a ‘job site’. It took 30 truckloads of engineered fill to prepare the building pad. All this took place on September 20, 2006.

Creating piles of dirt.

But it finally begins to take form to outline the house.